The Outcome

By working closely with Staff and the Board of The Theatre Centre, GBCA developed a specific programme that would not only accommodate their goals of establishing an arts hub, but also fit within the existing building. The design of a modest addition improved the functionality of the building, and by placing the addition to the rear of the heritage building (made possible by the fact that the building is situated on a corner lot), the impact of the modern feature on the key heritage-character defining features of the original building was minimized.

The interior planning was informed by the existing interior spaces, with the goal of maintaining some of the original historic spaces – for example, the original reading room of the library, with its detailed plaster mouldings, was adapted as the main theatre space. The addition was designed to serve as the new main entrance and lobby and provided opportunities for barrier-free access.

Have a project in mind?

Whether you’re planning a new development, transformation, or something entirely unique, we’d love to hear about it.

Our new website is taking shape. Some pages are still under construction. Thank you for your patience as we put the finishing touches on.

Close Welcome Bar